ROBOTICSCABLE ASSEMBLY
Zpet na vsechny sluzby

Kabely pro koncove nastroje (EOAT)

Vysokoflexibilni kabelove sestavy pro roboticke chapace, svarovaci hlavice, strikaciho pistole a vizni systemy v bode nastroje.

Kolaborativni robotyPrumyslova roboticka ramenaHumanoidni roboty
Free engineering review before quotePrototype sample supportTest report and documentation available

Prehled

Ucelove kabelove sestavy pro kazdy typ robotickeho koncoveho efektoru. Nase EOAT kabely zajisuji spolehlivy prenos napajeni, signalu a pneumaticky ovladani v nejnarocnejsich pohybovych profilech — male polomery ohybu, vysokorychlostni pick-and-place cykly a extremni torze na ose zapesti. Kompatibilni s platformami FANUC, ABB, KUKA, Universal Robots a Yaskawa, ktere se bezne pouzivaji v ceskych automobilovych zavodech a u dodavatelu dilu.

Klicove vlastnosti

15M+ ohybovych cyklu na ose zapesti
Kontinualni torze ±360°/m
Hybridni napajeni + signal + pneumatika
Pripraveno pro rozhrani rychle vymeny nastroju
Varianty pro cistou vyrobu a potravinarsky prumysl

Technicke specifikace

flex Life15 000 000+ cyklu
torsion±360°/m kontinualne
temperature-40 °C az +105 °C
protectionIP67 / IP69K
jacket MaterialsPUR, TPE, silikon
connectorsM8, M12, Harting, zakazkove

Potrebujete toto reseni?

Ziskejte nabidku na miru pro vase pozadavky na kabely pro koncove nastroje (eoat). Nasi inzenyri proverou vase specifikace a dodaji podrobny navrh.

Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
Zadat poptavkuZobrazit nase kapacity

What You Get Back

DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan

Buyer Questions Before RFQ

What should we send to get an accurate quote?

Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.

Will your team review the design before production?

Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.

Can you support prototype through volume release?

Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.