ROBOTICSCABLE ASSEMBLY
Bumalik sa Lahat ng Serbisyo

End-of-Arm Tooling (EOAT) Cables

High-flex cable assemblies para sa robotic grippers, welding torches, spray guns, at vision systems sa tool center point ng inyong robot.

Collaborative RobotsIndustrial Robot ArmsHumanoid Robots
Free engineering review before quotePrototype sample supportTest report and documentation available

Pangkalahatang-ideya

Cable assemblies na partikular na dinisenyo para sa bawat uri ng robotic end effector. Ang aming EOAT cables ay nagdedeliver ng maaasahang power, signal, at pneumatic control sa pinaka-demanding na motion envelopes—masikip na bend radii, high-speed pick-and-place cycles sa semiconductor assembly lines, at matinding torsion sa wrist axis. Angkop para sa FANUC, ABB, KUKA, Universal Robots, at Yaskawa platforms na ginagamit sa Philippine electronics manufacturing.

Mga Pangunahing Features

15M+ flex cycles sa wrist axis
±360°/m tuloy-tuloy na torsion rated
Hybrid power + signal + pneumatic
Quick-change tool interface ready
Cleanroom at food-grade na options

Technical Specifications

flex Life15,000,000+ cycles
torsion±360°/m tuloy-tuloy
temperature-40°C hanggang +105°C
protectionIP67 / IP69K
jacket MaterialsPUR, TPE, Silicone
connectorsM8, M12, Harting, Custom

Kailangan ang Solusyong Ito?

Kumuha ng custom quote para sa inyong end-of-arm tooling (eoat) cables requirements. Susuriin ng aming engineers ang inyong specifications at magbibigay ng detalyadong proposal.

Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
Humingi ng QuotationTingnan ang Aming Kakayahan

Ang Ibinalik Mo

DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan

Mga Tanong ng Mamimili Bago ang RFQ

What should we send to get an accurate quote?

Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.

Will your team review the design before production?

Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.

Can you support prototype through volume release?

Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.