ROBOTICSCABLE ASSEMBLY
High-flex robotics cable assembly and wire harness on a robot arm
Rapid PrototypingGlobal SupportNDA Protected

ROBOTIC
CABLE ASSEMBLIES
FOR NEXT-GEN ROBOTS

From Prototype to Production — Fast, Flexible, Confidential. The nervous system for next-gen industrial and collaborative robots.

IPC/WHMA-A-620
Hebei Cloom · ISO 9001

Get a Free Quote

First reply within 12 hours; quotation within 24 hours, valid for 30 days.

Click to upload or drag and drop

PDF, CAD, Images (Max 10MB each)

By submitting, you agree to our Privacy Policy

2007
The group was founded in 2007; the Shijiazhuang factory opened in 2011.
No MOQ
From one prototype to production batches
IPC/WHMA-A-620
Workmanship class agreed per program
Hebei Cloom · ISO 9001:2015Hebei Cloom · ISO 13485:2016

ROBOT CABLE ASSEMBLY CAPABILITIES

Rapid Prototyping

A sample is built to your drawing and BOM and approved by you before any batch order.

No minimum order quantity

Order one prototype or a production batch; the same drawing and BOM carry through.

Cost Optimization

Every quote itemizes material and labour, so you can see what drives the price.

Global Support

Quotes and engineering questions are handled in English by email; orders ship by tracked DHL or FedEx.

NDA & IP Protection

Strict confidentiality protocols. Your designs stay yours.

Professional Packaging

ESD-safe, moisture-proof, export-ready rigorous packaging.

Cost Transparency

A Fully Itemized Cost Breakdown With Every Quote

Most suppliers hand you a single lump-sum price. We give you a complete, line-by-line breakdown — so you know the cost of every component and every process step before you commit.

  • Line-by-line costing for every wire, terminal, connector and process step — material and labour itemized separately.
  • No hidden mark-ups: you see exactly how your quote is built and where every cent goes.
  • Makes internal budget approval and supplier cost benchmarking effortless.
Request a Detailed Quote
Sample itemized robotics cable assembly cost breakdown showing per-component material and labour costing

HOW A ROBOT CABLE ORDER WORKS

Five steps from your drawing to a shipped cable assembly.

01

Submit Design

Send us your CAD/BOM.

02

Review & Quote

Free engineering check.

03

Sample Approval

Sample and production lead times depend on complexity and are confirmed in your quote.

04

Production

Built to the approved sample, drawing and BOM, with the tests agreed in your quote.

05

Global Delivery

DHL/FedEx

Tracked shipping.

ROBOT CABLE ASSEMBLY TYPES WE BUILD

Engineered for extreme torsion, bending, and speed.

Internal robot arm wire harness routed for multi-axis motion

Robot Arm Internal Harness

High-flex continuous-flex drag-chain cables for robot motion

High-Flex Drag Chain Cables

M8 and M12 sensor cables for robot I/O connectivity

M8/M12 Sensor Cables

High-current power distribution harness for robotic systems

Power Distribution Harness

Custom connector cable assembly for robotics OEM integration

Custom Connector Solutions

Click any image to view full size

ROBOT TYPES AND INDUSTRIES WE SUPPLY

Reliable connectivity for diverse robotic applications.

Industrial Robots

Collaborative Robots

Semiconductor

Medical Robotics

AGV & AMR

Custom Automation

Asked before ordering a robotic cable assembly

Can you build a sample before the bulk order?
Yes. Before mass production we build a sample (usually 1–3 pcs) for your testing and approval, built to the same drawing and BOM as production. Full answer
Are harnesses tested before shipment, and which tests are done?
Yes. We generally run visual inspection (crimp condition and overall build), a pull test and a continuity test, following IPC/WHMA-A-620. The acceptance class and any extra tests are agreed before production. Full answer
Can you use UL-recognized wire in the harness?
Yes. We can build with UL-recognized AWM wire styles such as UL2464 and send the wire datasheet. Full answer

Robotic Cable Assembly Buyer FAQ

Questions buyers put to our harness sales team before a first order, with the answers the team gives as general practice.

Source: the sales knowledge base of our harness sales team (shared with our sister wire harness sites), built from 17,224 filtered customer enquiry and sales reply pairs from 1,566 customer contacts (distinct company email domains or individual addresses), November 2018 to 14 September 2026, counted November 2026. The answers use only points the team gives as general practice and leave out one-off cases, quotes, prices and lead times.

Can you build a sample before the bulk order?

Yes. Before mass production we build a sample and send it to you for approval. A sample run is usually 1–3 pieces, so you can test fit and function before releasing the batch order.

The sample is built to the same drawing, BOM and agreed tolerances as the production harness, and volume production follows the approved sample.

Are harnesses tested before shipment, and which tests are done?

Following the standard, we generally run three checks: visual inspection (terminal crimp condition and the overall appearance of the assembly), pull test, and continuity test.

Harness production and inspection follow IPC/WHMA-A-620. Our cable testers check resistance, continuity, insulation, open circuits and shorts. We can send our inspection and laboratory equipment list on request.

The IPC/WHMA-A-620 product class and the tests for your order are agreed with you before production. For a cable that moves with the robot, put the motion type (bending, torsion or drag chain), minimum bend radius and required cycle count on the drawing, so material suitability and any flex test can be confirmed for that project.

Which quality certifications do you hold, and can you send copies?

Hebei Cloom (Luquan, Shijiazhuang), the group’s harness manufacturing company, holds ISO 9001:2015, IATF 16949 and ISO 13485:2016 certificates. When a customer asks, the sales team sends copies of the certificates for supplier documentation.

Can you use UL-recognized wire in the harness?

Yes. We can build with UL-recognized AWM wire and cable styles, for example UL2464, and send the datasheet of the wire we plan to use. A UL-recognized cable made to a custom construction is also possible and is confirmed per enquiry.

The UL recognition belongs to the wire or cable itself. It is not a UL listing of the finished harness, and a UL2464 example does not by itself show that a wire suits a moving robot axis. Put the UL style, gauge and voltage rating you need on the drawing or BOM so we quote the right material.

Will you build with the wire brand and connectors on our drawing?

For wire, yes. When your drawing specifies a wire brand and type, for example because of a certification requirement, we follow the specified original brand and type strictly.

For connectors, we can build cable assemblies with JST connectors on request. Whether another connector brand can be used is confirmed per enquiry, so list the manufacturer part numbers in your BOM.