ROBOTICSCABLE ASSEMBLY

MANUFACTURING CAPABILITIES

World-class facilities sa Michigan Economic Zone, advanced equipment, at mahigpit na quality systems na nagdedeliver ng cable assemblies na tumutugon sa demanding requirements ng robotics applications. Proudly Made in USA.

Humiling ng Factory Tour
IPC A-620m²
IPC/WHMA-A-620 Class 3
100%
Saklaw ng electrical testing
No MOQ
Mula prototype hanggang production
2007
Bahagi ng OurPCB group mula

Engineering at Design

Ang aming engineering team ay nakikipagtulungan sa inyong designers para i-optimize ang cable assemblies para sa manufacturability, reliability, at cost.

Design Review

Libreng engineering review ng inyong cable assembly designs na may DFM recommendations

3D Routing Simulation

Virtual cable routing para i-validate ang bend radius at interference bago ang prototyping

Material Selection

Expert guidance sa wire, connector, at jacket material selection para sa inyong environment

Documentation

Kumpletong drawing packages kasama ang assembly drawings, BOMs, at test specifications

Design Software

SolidWorksAutoCAD ElectricalEPLANZuken E3

Ang aming engineering team ay dalubhasa sa pagdisenyo ng:

Production at Manufacturing

State-of-the-art equipment at lean manufacturing processes sa aming Michigan facility na tinitiyak ang consistent quality at on-time delivery.

Wire Processing

  • Automatic wire cutting machines (Komax, Schleuniger)
  • Precision wire stripping stations
  • Laser wire marking systems
  • Ultrasonic wire splicing

Crimping at Termination

  • Fully automatic terminal crimping (Komax Alpha)
  • Semi-automatic crimp presses na may force monitoring
  • Crimp height measurement systems
  • Cross-section analysis equipment

Assembly

  • Assembly workbenches na may ESD protection
  • Ultrasonic welding stations
  • Heat shrink processing tunnels
  • Potting at overmolding equipment

Cable Management

  • Wire twisting machines
  • Cable braiding machines
  • Spiral wrap application
  • Conduit at loom installation

Production Capacity

Nag-iiba ayon sa aplikasyon
Buwanang Terminations
Nag-iiba ayon sa aplikasyon
Harnesses/Buwan
2 shifts, puwedeng maging 3
Shift Capacity

High-volume production capabilities para sa:

Quality Control

Multi-stage quality control na tinitiyak na bawat cable assembly ay tumutugon sa specifications bago ipadala.

1

Incoming Inspection

  • Material certification verification
  • Visual inspection
  • Sample testing per AQL
2

In-Process Control

  • First article inspection
  • Crimp force monitoring
  • Visual inspection sa bawat station
3

Final Test

  • 100% electrical continuity
  • Insulation resistance
  • Hi-pot testing (kung kinakailangan)
4

Outgoing Quality

  • Final visual inspection
  • Packaging verification
  • Documentation check
Nag-iiba ayon sa aplikasyon
Defect Rate
100% Saklaw ng electrical testing
On-Time Delivery
Nag-iiba ayon sa aplikasyon
Customer Returns

Testing Laboratory

In-house testing na nagva-validate ng cable performance bago ang production at nagve-verify ng patuloy na kalidad.

Electrical Testing

  • Continuity testing
  • Insulation resistance (hanggang 1000V DC)
  • Hi-pot testing (hanggang 5kV AC/DC)
  • Contact resistance measurement

Mechanical Testing

  • Pull force testing (hanggang 500N)
  • Crimp cross-section analysis
  • Flex life testing (10M+ cycles)
  • Torsion testing

Environmental Testing

  • Temperature cycling (-40°C hanggang +150°C)
  • Humidity exposure
  • Salt spray testing
  • UV exposure

Specialized Testing

  • EMI/EMC pre-compliance
  • Flame retardancy (UL VW-1)
  • Chemical resistance
  • Abrasion resistance

Critical testing para sa demanding applications:

Mga Certification at Compliance

Ang mga sertipikasyon ay hawak ng aming manufacturing entity, Hebei Cloom, na gumagawa ng aming robotics cable assemblies. Maaaring i-download sa ibaba ang mga orihinal na sertipiko.

ISO 9001:2015

Sistema ng Pamamahala ng Kalidad

Hawak ng Hebei Cloom · Cert. 19824QL3575R0S · valid hanggang 2027-12-30

Download certificate

ISO 13485:2016

QMS ng medical device — paggawa ng medical wire harness

Hawak ng Hebei Cloom · Cert. G25Q2GZ1262R0M · valid hanggang 2028-12-22

Download certificate

IPC/WHMA-A-620 certified specialist sa team

Pagkakagawa ng cable at wire harness (Class 3)

IPC/WHMA-A-620E CIS — Yulong Zhang · valid hanggang 2028-03

Download certificate

Mga deklarasyon ng RoHS / REACH

Pagsunod ng materyal

Ibinibigay ang mga deklarasyon ng materyal kapag hiniling

Factory Gallery

Kumuha ng virtual tour sa aming Michigan facility

Malinis na Manufacturing Facility

Malinis na Manufacturing Facility

Automated Harness Assembly Line

Automated Harness Assembly Line

Wire Harness Testing Equipment

Wire Harness Testing Equipment

Automatic Wire Cutting at Crimping

Automatic Wire Cutting at Crimping

Cable Quality Testing Machine

Cable Quality Testing Machine

Wire Harness Packaging Service

Wire Harness Packaging Service

Tingnan ang Aming Capabilities in Action

Mag-schedule ng virtual factory tour o bisitahin kami nang personal sa Michigan para makita kung paano namin masusuportahan ang inyong robotics cable assembly needs.