返回全部服務
拖鏈電纜組裝
為拖鏈和能量鏈中的連續運動設計的高柔性電纜。
AGV/AMR物流機器人工業自動化
Free engineering review before quotePrototype sample supportTest report and documentation available
服務概述
專為拖鏈和電纜載體應用打造的線纜組裝。設計用於高速連續線性運動而不發生故障。完美適用於龍門系統、取放機器和自動化產線。
核心優勢
2000萬次以上彎折循環
自支撐設計
耐油耐冷卻液
高速運動(5m/s+)
加速度可達10m/s²
技術規格
flex Life2000萬次以上
travel Speed最高5 m/s
acceleration最高10 m/s²
travel Length最長100m
需要此解決方案?
取得拖鏈電纜組裝的客製化報價。我們的工程師將評審您的技術規格並提供詳細方案。
Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
你得到什麼
DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan
詢價前買家提問
What should we send to get an accurate quote?
Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.
Will your team review the design before production?
Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.
Can you support prototype through volume release?
Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.