ROBOTICSCABLE ASSEMBLY
Bumalik sa Lahat ng Serbisyo

Flat Flexible Cable (FFC/FPC) Assembly

Mga ultra-manipis na FFC at FPC assembly para sa robotic vision system, teach pendant, embedded controller, at compact end effector na nangangailangan ng high-density signal routing sa makitid na espasyo.

Collaborative RobotHumanoid RobotIndustrial Robot ArmAGV at AMR
Free engineering review before quotePrototype sample supportTest report and documentation available

Pangkalahatang-ideya

Ang flat flexible cable (FFC) at flexible printed circuit (FPC) ang pundasyon ng compact, high-density signal routing sa loob ng modernong mga robot. Bawat vision-guided pick-and-place system, bawat teach pendant display, at bawat miniaturized end-effector controller ay umaasa sa flat flexible interconnect para magdala ng dose-dosenang — minsan daan-daang — signal line sa mga espasyong hindi kasya ang mga round cable. Ang aming FFC/FPC assembly ay partikular na dinisenyo para sa robotic environment: ang reinforced ZIF/LIF connector termination ay lumalaban sa vibration at shock ng tuloy-tuloy na operasyon, ang polyimide-based FPC construction ay tumatagal ng higit sa 200,000 dynamic flex cycle sa bend radii na kasing liit ng 1 mm, at ang EMI-shielded variant ay nagpapanatili ng signal integrity para sa high-speed MIPI CSI camera link at LVDS display interface. Nagde-deliver kami ng kumpletong assembly mula sa single-layer FFC ribbon cable hanggang multi-layer rigid-flex FPC design na may embedded component, sakop ang pitch range mula 0.3 mm hanggang 2.54 mm. Mula sa 10-piece engineering sample hanggang higit sa 100,000 monthly production volume, bawat assembly ay naipapadala nang may 100% continuity testing, impedance verification para sa controlled-impedance design, at buong IPC-6013 Class 3 certification.

Mga Pangunahing Features

Pitch option mula 0.3 mm hanggang 2.54 mm
Higit sa 200,000 dynamic flex cycle (FPC)
ZIF/LIF/ACF connector termination
EMI shielding para sa MIPI CSI at LVDS
Mula single-layer FFC hanggang multi-layer rigid-flex FPC
IPC-6013 Class 3 certified production

Technical Specifications

pitch0.3 mm to 2.54 mm
layersSingle-layer FFC / 1–8 layer FPC
flex Life200,000+ dynamic cycles (FPC)
bend RadiusDown to 1 mm (single-layer)
impedanceControlled impedance ±10% (50Ω, 90Ω, 100Ω)
connectorsZIF, LIF, ACF bonding, Soldered
temperature-40°C to +105°C (polyimide)
shieldingCopper/silver ink, sputtered metal film

Kailangan ang Solusyong Ito?

Kumuha ng custom quote para sa inyong flat flexible cable (ffc/fpc) assembly requirements. Susuriin ng aming engineers ang inyong specifications at magbibigay ng detalyadong proposal.

Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
Humingi ng QuotationTingnan ang Aming Kakayahan

Ang Ibinalik Mo

DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan

Mga Tanong ng Mamimili Bago ang RFQ

What should we send to get an accurate quote?

Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.

Will your team review the design before production?

Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.

Can you support prototype through volume release?

Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.