ROBOTICSCABLE ASSEMBLY
返回全部服务

定制连接器方案

定制连接器组装和包胶线缆解决方案。

人形机器人医疗机器人特殊应用
Free engineering review before quotePrototype sample supportTest report and documentation available

服务概述

当标准产品无法满足需求时,我们根据您的精确要求设计定制连接器解决方案。从改进的标准连接器到完全定制的包胶组件,我们为您的机器人提供完美的接口方案。

核心优势

定制包胶成型
混合信号/电源连接器
空间优化设计
盲插选项
快换接口

技术规格

overmold MaterialsPUR、TPE、硅胶
ip Rating最高IP69K
mating Cycles10000次以上
customization全程设计支持

需要此解决方案?

获取定制连接器方案的定制报价。我们的工程师将评审您的技术规格并提供详细方案。

Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
获取报价查看生产能力

你得到什么

DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan

询价前买家提问

What should we send to get an accurate quote?

Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.

Will your team review the design before production?

Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.

Can you support prototype through volume release?

Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.