ROBOTICSCABLE ASSEMBLY
返回全部服务

传感器与信号线缆

用于编码器、视觉系统和工业传感器的精密信号电缆。

各类机器人视觉系统精密设备
Free engineering review before quotePrototype sample supportTest report and documentation available

服务概述

高性能信号电缆,专为苛刻机器人环境中的精确数据传输设计。从编码器反馈到视觉系统连接,我们的电缆通过卓越的EMI保护确保可靠的信号完整性。

核心优势

低电容设计
360°屏蔽覆盖
M8/M12连接器选项
IP67/IP69K防护等级
PUR/PVC护套可选

技术规格

impedance匹配传感器规格
shield Coverage≥95%
connectorsM8、M12、定制
protectionIP67/IP69K

需要此解决方案?

获取传感器与信号线缆的定制报价。我们的工程师将评审您的技术规格并提供详细方案。

Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
获取报价查看生产能力

你得到什么

DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan

询价前买家提问

What should we send to get an accurate quote?

Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.

Will your team review the design before production?

Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.

Can you support prototype through volume release?

Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.