返回全部服务
机械臂内部线束
适用于4-7轴机械臂的多轴内部布线,具有高抗扭性能。
工业机械臂协作机器人SCARA机器人
Free engineering review before quotePrototype sample supportTest report and documentation available
服务概述
完整的机械臂内部布线解决方案,设计可承受数百万次弯折循环同时保持信号完整性。我们的线束通过优化的弯曲半径管理,将电源、数据和传感器信号路由通过每个关节。
核心优势
1000万次以上弯折寿命
多轴布线设计
EMI/RFI屏蔽选项
紧凑弯曲半径(7.5×外径)
温度范围:-40°C至+105°C
技术规格
flex Life1000万次以上
bend Radius7.5×外径
temperature-40°C至+105°C
shielding编织/箔/复合屏蔽
需要此解决方案?
获取机械臂内部线束的定制报价。我们的工程师将评审您的技术规格并提供详细方案。
Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
你得到什么
DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan
询价前买家提问
What should we send to get an accurate quote?
Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.
Will your team review the design before production?
Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.
Can you support prototype through volume release?
Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.