返回全部服务
电源分配线束
用于电机、驱动器和电池系统的重载电源电缆。
AGV/AMR工业机器人清洁机器人
Free engineering review before quotePrototype sample supportTest report and documentation available
服务概述
为机器人驱动系统、电池组和电机连接提供的强劲电源分配解决方案。设计可承受高电流负载,同时在苛刻应用中保持柔韧性和热性能。
核心优势
高电流容量(最高200A)
低压降设计
热管理优化
电池组集成
快速断开选项
常见应用场景
此服务广泛应用于以下机器人领域。点击了解各行业的具体需求:
技术规格
current Rating最高200A
voltage Range12V至800V DC
wire GaugeAWG 18至AWG 2/0
connectorsAnderson、TE、定制
需要此解决方案?
获取电源分配线束的定制报价。我们的工程师将评审您的技术规格并提供详细方案。
Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
你得到什么
DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan
询价前买家提问
What should we send to get an accurate quote?
Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.
Will your team review the design before production?
Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.
Can you support prototype through volume release?
Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.