ROBOTICSCABLE ASSEMBLY
Bumalik sa Lahat ng Serbisyo

CAN Bus Cable Assembly

120Ω impedance-matched na CAN bus cable assembly para sa robotic drive network, sensor communication, at distributed control system na sumusuporta sa CAN 2.0, CAN FD, CANopen, at DeviceNet protocol.

Industrial Robot ArmAGV at AMRCollaborative RobotWelding Robot
Free engineering review before quotePrototype sample supportTest report and documentation available

Pangkalahatang-ideya

Bawat multi-axis na robot ay umaasa sa CAN bus backbone upang i-coordinate ang servo drive, safety controller, I/O module, at sensor node sa isang twisted-pair network. Isang impedance mismatch o shield break lang kahit saan sa bus ang sapat para mawala ang mga packet, mag-trigger ng fault code, at huminto ang produksyon. Ang aming CAN bus cable assembly ay engineered mula sa conductor pair panlabas upang mapanatili ang 120Ω ±10% characteristic impedance sa buong operating frequency range — mula CAN 2.0 sa 1 Mbps hanggang CAN FD sa 8 Mbps. Gumagawa kami ng kumpletong bus segment na may factory-terminated connector, integrated 120Ω termination resistor kung saan tinukoy, at continuous-flex PUR jacket na rated para sa higit sa 10 milyong bend cycle sa drag-chain at torsion application. Bawat assembly ay ipinapadala na 100% TDR-verified para sa impedance continuity at electrically tested para sa conductor resistance, insulation resistance, at shield coverage. Mula sa 2-node point-to-point link hanggang 64-node distributed bus architecture, nagde-deliver kami ng CAN cabling na nagpapanatiling nakikipag-communicate ang inyong robot cell nang walang kahit isang retransmission. Compatible sa FANUC, ABB, KUKA, Yaskawa, Siemens, Beckhoff, at Omron platform na gumagamit ng CANopen, DeviceNet, J1939, o proprietary CAN protocol.

Mga Pangunahing Features

120Ω ±10% matched impedance (ISO 11898)
Handa para sa CAN 2.0A/B, CAN FD, at CAN XL
Higit sa 10M flex cycle para sa drag-chain at torsion
Integrated 120Ω bus termination option
Double-shielded: braid + foil (≥90% coverage)
Factory TDR-verified impedance continuity

Technical Specifications

impedance120Ω ±10% (ISO 11898-2)
protocolsCAN 2.0A/B, CAN FD (up to 8 Mbps), CANopen, DeviceNet, J1939
conductors2× twisted pair, 22–24 AWG stranded
shieldingBraid + foil, ≥90% optical coverage
flex Life10,000,000+ cycles
temperature-40°C to +105°C
connectorsM12 A-code, Nano M12, DB9, Open-end, Custom
jacketPUR (drag-chain) / PVC (fixed install)

Kailangan ang Solusyong Ito?

Kumuha ng custom quote para sa inyong can bus cable assembly requirements. Susuriin ng aming engineers ang inyong specifications at magbibigay ng detalyadong proposal.

Cable drawing, BOM, or sample photos
Expected quantity and target lead time
Motion, environment, and approval requirements
Humingi ng QuotationTingnan ang Aming Kakayahan

Ang Ibinalik Mo

DFM and specification gap review
Quoted price and production timeline
Testing scope and documentation plan

Mga Tanong ng Mamimili Bago ang RFQ

What should we send to get an accurate quote?

Send your drawing, BOM, quantity forecast, application environment, and any required approvals. Missing inputs create avoidable assumptions in pricing and lead time.

Will your team review the design before production?

Yes. Engineering review happens before quotation so connector, flex-life, shielding, and routing risks are flagged before you commit.

Can you support prototype through volume release?

Yes. We support first samples, validation builds, and production ramp with traceability and test requirements kept aligned.